IWR-Pressedienst.de

Pressemitteilungen der Energiewirtschaft seit 1999

fotolia 73444491 1280 256

Press Release

Herausgeber: Nordex SE

Nordex Group receives order for nearly 107 MW in North Rhine-Westphalia, Germany

© Nordex SE / Ulrich Mertens
© Nordex SE / Ulrich Mertens
Hamburg (renewablepress) - The Nordex Group has received a new order in North Rhine-Westphalia: The client is Bürgerwind Hollich GmbH & Co. KG. As part of a repowering project, the Nordex Group will supply and install twelve N163/6.X wind turbines on 164-meter-high hybrid towers, as well as four N149/5.X turbines on 125-meter-high tubular steel towers. The order, totaling 106.8 MW, also includes a premium maintenance contract with a term of 25 years, ensuring the long-term and reliable operation of the wind turbines.

Since 2015, eight Nordex N131 turbines have been operating in the Hollich Sellen citizens’ wind farm, which is part of the company group. This wind farm is also located near the town of Steinfurt in northern Münsterland, in close proximity to the Nordex service point in Steinfurt. This ensures optimal support and short response times for all 16 new turbines at the site in the future. The first turbine is scheduled to deliver clean electricity starting in spring 2027.

Jörg Tiemann, Managing Director of the Bürgerwindpark Hollich Group, notes: “We did not make the selection of turbines lightly. For us, only established German manufacturers were seriously considered. Among other reasons, our decision in favor of Nordex was based on many years of positive experience in project implementation and service, the advanced turbine technology, and our trust in this manufacturer. I would especially like to highlight the constructive approach during the extensive contract negotiations, where both parties interacted as equals.”

Karsten Brüggemann, Vice President Region Central at the Nordex Group, says: “After operating the Nordex N131 turbines, we are now delighted to be able to install the next generation of wind turbines in the Hollich wind farm with the modern N163/6.X and N149/5.X. Jörg Tiemann, who has been an active and well-known participant in citizens’ wind initiatives for many years, is one of our most valued business partners.”

Repowering refers to the replacement of older wind turbines with modern, higher-performance turbines at the same location. This significantly increases the efficiency of the wind farm, boosts electricity generation capacity and optimises land use. Repowering is a key building block for the energy transition, as it upgrades existing sites with the latest technology, enabling them to make an even greater contribution to sustainable energy supply.


Profile of the Bürgerwind Hollich Gruppe

The Bürgerwind Hollich Gruppe consists of Windpark Hollich (founded in 2001) and Bürgerwindpark Hollich Sellen (founded in 2015), which has been certified by the Steinfurt district as a genuine citizens’ wind farm.

Both companies currently operate 35 wind turbines in Steinfurt (North Rhine-Westphalia) and are supported by more than 1,000 directly involved citizens. For the repowering project, a new company was founded in which the existing company is participating, and, following the creation of a sales prospectus, residents, landowners, and citizens from the surrounding area of the park will also be able to participate.


About the Nordex Group

The Group has installed around 57 GW of wind power capacity in over 40 markets in its corporate history and generated consolidated sales of around EUR 7.3 billion in 2024. The Company currently has more than 10,400 employees with a manufacturing network that includes factories in Germany, Spain, Brazil, India, USA and Mexico. Its product portfolio is focused on onshore turbines in the 4 to 6 MW+ classes which are designed to meet the market requirements of countries with limited available space and regions with constrained grid capacity.


Download press photo:
https://www.iwrpressedienst.de/bild/nordex/b633f_Nordex-UMertens-171225.jpg
© Nordex SE / Ulrich Mertens


Hamburg, 17 December 2025


Publication and Reprint free of charge; please send a voucher copy to Nordex SE.



Attention editorial offices - For further questions please contact:


Media contact:
Nordex SE
Felix Losada
Phone: +49 (0)40-30030–1000
E-Mail: flosada@nordex-online.com

Investor contact:
Nordex SE
Anja Siehler
Phone: +49 (0)40-30030–1000
E-Mail: asiehler@nordex-online.com


Nordex SE
Langenhorner Chaussee 600
22419 Hamburg

Internet: https://www.nordex-online.com


Jörg Tiemann
Bürgerwind Hollich Gruppe
Phone: +49 171 8 11 22 86
E-Mail: tiemann@windpark-hollich.de



Sprache:

Online-Pressemappe - alle Pressemitteilungen der Nordex SE | RSS-Feed abonnieren


Pressebilder nur für die redaktionelle Verwendung
Hinweis: Für den Inhalt der Pressemitteilung ist der Emittent / Herausgeber der Meldung »Nordex SE« verantwortlich.

Die Pressemitteilung "Nordex Group receives order for nearly 107 MW in North Rhine-Westphalia, Germany" von Nordex SE ist auch in folgenden Sprachen abrufbar

Daten werden aktualisiert...
Daten werden aktualisiert...

About Nordex SE

The development, manufacture, project management and servicing of wind turbines in the onshore segment has been the core competence and passion of the Nordex Group and its more than 7,900 employees worldwide since 1985. As one of the world's largest wind turbine manufacturers, the Nordex Group offers high-yield, cost-efficient wind turbines under the Acciona Windpower and Nordex brands that enable long-term and economical power generation from wind energy in all geographical and climatic conditions.

The focus is on turbines in the 3 to 5MW+ class, and the Group’s comprehensive product portfolio offers individual solutions for both markets with limited space and regions with limited grid capacities. With more than 29 GW of installed capacity worldwide, Nordex Group systems deliver sustainable energy throughout more than 80 per cent of the world’s energy market (excluding China).

Nordex SE is listed on the TecDAX of the Frankfurt Stock Exchange. The management holding company is headquartered in Rostock, while the executive board and administrative offices are based in Hamburg. At production facilities in Germany, Spain, Brazil, the US, and India, the Nordex Group produces its own nacelles, rotor blades and concrete towers. The Group also maintains offices and branches in more than 25 countries.

Business areas

Production, sales, finance, project engineering, turn-key projects, service

Products & Services

Our product range with tubular steel towers as well as hybrid towers:

Wind Turbine Type
Rated power in kW
Rotor diameter in m
Delta 4000 N133/4.8 4800 133
Delta 4000 N149/4.0-4.5 4000 - 4800 149
Delta 4000 N149/5.X > 5000 149
Delta 4000 N155/4.X > 4000 155
Delta 4000 N155/5.X > 5000 155
Delta 4000 N163/5.X > 5000 163
Delta N117/3600 3600 117
Delta N131/3600 3600 131
Delta N131/3900 3900 131

More Information about Nordex SE

Press Contact

Felix Losada

Felix Losada
Nordex SE
E-Mail: flosada@nordex-online.com
Phone: +49 (0)40 - 300 30 - 1141