IWR-Pressedienst.de

Pressemitteilungen der Energiewirtschaft seit 1999

fotolia 73444491 1280 256

Press Release

Herausgeber: Nordex SE

Nordex Group has connected 207 MW wind farm successfully to the grid according to schedule

Local tower production pays off

Hamburg (renewablepress) - The global trend towards larger projects is clearly evident in the wind power industry. Since the mid-1980s the capacity of individual wind farms has risen from less than 50 megawatts to several hundred megawatts. The reasons for this are obvious: business in renewable energies has attracted financially potent investors, while governments all around the world are committed to clean energy and large projects are specifically less expensive.

This has also resulted in changes in the business of manufacturers such as the Nordex Group which has been active since 1985. Explains Patxi Landa, a member of Nordex SE’s Management Board: "Part of the Company focused on large-scale projects right from the outset. In Europe, however, this frequently varied in regional terms. Here, too, the sale of individual turbines is no longer common today. This was generally not particularly efficient – either for our customers or for us.” Since Nordex has been increasingly executing projects outside Europe, the size of the individual contracts has widened substantially. Thus, the Company connected one of its largest wind farms to the grid in Brazil at the end of 2017.

This was the “Santa Vitoria do Palmar Wind Farm Complex”, which is composed of 69 AW125/3000 turbines with a combined capacity of 207 megawatts. The complexity of this task was not solely due to the sheer scale of the project. "In particular, local production of major components gives us a cost advantage to the benefit of our customers. For instance, we established a new local tower manufacturing facility. Part of the team of 250 also took care of the production of the 69 concrete towers. Owing to their huge dimensions, we would not have been able to transport the total of over 1,500 concrete sections from our factory located 4,600 kilometres north. That would have been too expensive and ecologically unfeasible”, explains Marcelo Menescal, Nordex Brazil Project Management Director.

The nacelles and rotor blades were transported to the building site by truck or ship from the central factories located in more northerly parts of Brazil. "In addition, we supported our customer in preparing the construction site; after all, we were tasked with installing the wind turbines, and everything needs to fit exactly on assembly," adds Marcelo.

After a construction period of around 17 months, the project manager is satisfied with the results as the wind farm was connected to the grid within the agreed period and is currently producing electricity for more than 400,000 households. The customer Atlantic Energy Renewables is also pleased, having confirmed the second contract for a wind farm of a comparable size last year. Santa Vitoria do Palmar is ready and operative and it is now up to Nordex’s local service team to ensure good and clean yields over the next 15 years.


Download press photos:

https://www.iwrpressedienst.de/bilddatenbank/nordex/50c34_Size_of_wind_projects.jpg
https://www.iwrpressedienst.de/bilddatenbank/nordex/d0f22_foto_drone53.jpg
© Nordex SE



Project overview:

Wind farm: Santa Vitoria do Palmar

Owner: Atlantic Energy Renewables

Installed capacity: 207 megawatts

Wind turbine: 69 AW125/3000 turbines

Tower height: TH 120 (concrete tube)

Location: South Brazil, Santa Vitoria do Palmar

Construction period: June 2016 until October 2017

On line since: November 2017

Scope of contract: Delivery and installation of the turbines. Compliance with local content requirements Wind farm services for a period of at least 15 years.


Hamburg, 8 June 2018


Publication and Reprint free of charge; please send a voucher copy to Nordex SE.



Attention editorial offices: For further questions please contact


Media contact:
Ralf Peters
Phone: +49-40-30030–1000
E-Mail: rpeters@nordex-online.com


Nordex SE
Langenhorner Chaussee 600
22419 Hamburg

Internet: http://www.nordex-online.com



Sprache:

Online-Pressemappe - alle Pressemitteilungen der Nordex SE | RSS-Feed abonnieren


Pressebilder nur für die redaktionelle Verwendung
Hinweis: Für den Inhalt der Pressemitteilung ist der Emittent / Herausgeber der Meldung »DE813076467« verantwortlich.

Die Pressemitteilung "Nordex Group has connected 207 MW wind farm successfully to the grid according to schedule" von DE813076467 ist auch in folgenden Sprachen abrufbar

Daten werden aktualisiert...
Daten werden aktualisiert...

About Nordex SE

The development, manufacture, project management and servicing of wind turbines in the onshore segment has been the core competence and passion of the Nordex Group and its more than 7,900 employees worldwide since 1985. As one of the world's largest wind turbine manufacturers, the Nordex Group offers high-yield, cost-efficient wind turbines under the Acciona Windpower and Nordex brands that enable long-term and economical power generation from wind energy in all geographical and climatic conditions.

The focus is on turbines in the 3 to 5MW+ class, and the Group’s comprehensive product portfolio offers individual solutions for both markets with limited space and regions with limited grid capacities. With more than 29 GW of installed capacity worldwide, Nordex Group systems deliver sustainable energy throughout more than 80 per cent of the world’s energy market (excluding China).

Nordex SE is listed on the TecDAX of the Frankfurt Stock Exchange. The management holding company is headquartered in Rostock, while the executive board and administrative offices are based in Hamburg. At production facilities in Germany, Spain, Brazil, the US, and India, the Nordex Group produces its own nacelles, rotor blades and concrete towers. The Group also maintains offices and branches in more than 25 countries.

Business areas

Production, sales, finance, project engineering, turn-key projects, service

Products & Services

Our product range with tubular steel towers as well as hybrid towers:

Wind Turbine Type
Rated power in kW
Rotor diameter in m
Delta 4000 N133/4.8 4800 133
Delta 4000 N149/4.0-4.5 4000 - 4800 149
Delta 4000 N149/5.X > 5000 149
Delta 4000 N155/4.X > 4000 155
Delta 4000 N155/5.X > 5000 155
Delta 4000 N163/5.X > 5000 163
Delta N117/3600 3600 117
Delta N131/3600 3600 131
Delta N131/3900 3900 131

More Information about Nordex SE

Press Contact

Felix Losada

Felix Losada
Nordex SE
E-Mail: flosada@nordex-online.com
Phone: +49 (0)40 - 300 30 - 1141