IWR-Pressedienst.de

Pressemitteilungen der Energiewirtschaft seit 1999

fotolia 73444491 1280 256

Press Release

Herausgeber: Nordex SE

Success for Nordex in the United Kingdom

- Contracts received from RES

Hamburg - Nordex SE is continuing to grow in the United Kingdom, having been awarded a further two projects with a combined installed output of 25 MW by renowned customer RES.

The six N90/2500 turbine Jack’s Lane Wind Farm is located in North West Norfolk and at 15 megawatts (MW) ocould generate sufficient renewable electricity to meet the average needs of more than 10,600 homes each year. The 10MW Woolley Hill Wind Warm in Huntingdonshire, comprises four N100/2500 turbines capable of powering more than 8,000 homes.

RES and Nordex previously worked together on several projects in Northern Ireland with a total installed capacity of 90MW. The current partnership builds on this previous relationship, with the Nordex N90/2500 turbines used at Jack’s Lane Wind Farm, and N100/2500 model at Woolley Hill Wind Farm proving to be the most cost-effective option for delivering full optimised energy yields for the respective projects.

“We are pleased to be able to execute a further two projects with our core customer RES for our proven N90 and N100 turbines,” said Nordex Management Board member Lars Bondo Krogsgaard.

Ted Picken, Construction Director for RES UK & Ireland, commented; “We look forward to working with Nordex again - a company with a track-record for delivering full optimisation of energy yield at sites throughout the UK. Running the Woolley Hill and Jack’s Lane turbine contracts in parallel provides us with an overall cost reduction in the project management, technical engineering and contract administration that in turn encourages close cooperation between the expertise in each organisation.”


Following the construction of the wind farm infrastructure over the next six months, turbines are programmed to be installed and operational by the end of the year.

1. RES is one of the world’s leading independent renewable energy project developers with operations across Europe, the Americas and Asia-Pacific. At the forefront of wind energy development for over 30 years, RES has developed and/or built more than 8,000MW of wind energy capacity worldwide. In the UK alone, RES currently has more than 1,000MW of wind energy projects either constructed, under construction or consented. RES is active in a range of renewable energy technologies including large-scale biomass, solar, wave and tidal and on-site renewable installations. For more information, visit www.res-group.com


2. As one of the technological leaders in multi-megawatt wind power systems, Nordex is benefiting from the trend in favour of large-scale turbines. The Generation Gamma range comprises the N90/2500, N100/2500 and the N117/2400, which is one of the most efficient onshore turbines. To date, over 2,600 of these turbines have been produced. This experience with multi-megawatt turbines gives Nordex a decisive lead over most of its competitors. With Generation Delta, Nordex is now offering the fourth generation of its proven multi-megawatt platform (N100/3300, N117/3000, N131/3000). Nordex has installed a total of more than 5,800 turbines with an aggregate capacity of around 10,000 MW all around the world. With exports accounting for than 85 percent of its business, Nordex SE plays a key role in international high-growth regions. The Company has offices and subsidiaries in 22 countries around the world with a total global headcount of over 2,500 employees.


3. Jack’s Lane Wind Farm: The homes equivalent has been calculated by taking the predicted annual electricity generation of the site (based on RES studies Jack’s Lane Wind Farm has a predicted capacity factor of 34.3%) and dividing this by the annual average consumption figures from the Department of Energy and Climate Change 2012 (4222kWh). For further information on the Jack’s Lane Wind Farm, please visit www.jackslanewindfarm.co.uk


4. Woolley Hill Wind Farm: The homes equivalent has been calculated by taking the predicted annual electricity generation of the site (based on RES studies Woolley Hill Wind Farm has a predicted capacity factor of 39.1%) and dividing this by the annual average consumption figures from the Department of Energy and Climate Change 2012 (4222kWh). For further information on the Woolley Hill Wind Farm, please visit www.woolleyhill.co.uk


Download press photo:
- https://www.iwrpressedienst.de/nordex/26032014/DBP.PC_0086w.jpg


Hamburg, 27 March 2014


Publication and Reprint free of charge; please send a voucher copy to
Nordex SE.


Attention editorial offices: For further questions please contact Mr.
Felix Losada, Nordex SE.

Media contact
Felix Losada
Tel: + 49 (0)40/300 30 1000
Fax: + 49 (0)40/300 30 1001
E-mail: flosada@nordex-online.com
Internet: http://www.nordex-online.com

Nordex SE
Langenhorner Chaussee 600
22419 Hamburg, Germany



Sprache:

Online-Pressemappe - alle Pressemitteilungen der Nordex SE | RSS-Feed abonnieren


Pressebilder nur für die redaktionelle Verwendung
Hinweis: Für den Inhalt der Pressemitteilung ist der Emittent / Herausgeber der Meldung »DE813076467« verantwortlich.

Die Pressemitteilung "Success for Nordex in the United Kingdom" von DE813076467 ist auch in folgenden Sprachen abrufbar

Daten werden aktualisiert...
Daten werden aktualisiert...

About Nordex SE

The development, manufacture, project management and servicing of wind turbines in the onshore segment has been the core competence and passion of the Nordex Group and its more than 7,900 employees worldwide since 1985. As one of the world's largest wind turbine manufacturers, the Nordex Group offers high-yield, cost-efficient wind turbines under the Acciona Windpower and Nordex brands that enable long-term and economical power generation from wind energy in all geographical and climatic conditions.

The focus is on turbines in the 3 to 5MW+ class, and the Group’s comprehensive product portfolio offers individual solutions for both markets with limited space and regions with limited grid capacities. With more than 29 GW of installed capacity worldwide, Nordex Group systems deliver sustainable energy throughout more than 80 per cent of the world’s energy market (excluding China).

Nordex SE is listed on the TecDAX of the Frankfurt Stock Exchange. The management holding company is headquartered in Rostock, while the executive board and administrative offices are based in Hamburg. At production facilities in Germany, Spain, Brazil, the US, and India, the Nordex Group produces its own nacelles, rotor blades and concrete towers. The Group also maintains offices and branches in more than 25 countries.

Business areas

Production, sales, finance, project engineering, turn-key projects, service

Products & Services

Our product range with tubular steel towers as well as hybrid towers:

Wind Turbine Type
Rated power in kW
Rotor diameter in m
Delta 4000 N133/4.8 4800 133
Delta 4000 N149/4.0-4.5 4000 - 4800 149
Delta 4000 N149/5.X > 5000 149
Delta 4000 N155/4.X > 4000 155
Delta 4000 N155/5.X > 5000 155
Delta 4000 N163/5.X > 5000 163
Delta N117/3600 3600 117
Delta N131/3600 3600 131
Delta N131/3900 3900 131

More Information about Nordex SE

Press Contact

Felix Losada

Felix Losada
Nordex SE
E-Mail: flosada@nordex-online.com
Phone: +49 (0)40 - 300 30 - 1141