IWR-Pressedienst.de

Pressemitteilungen der Energiewirtschaft seit 1999

fotolia 73444491 1280 256

Press Release

Herausgeber: M+W Zander FE GmbH

M+W Zander takes on complete technical and infrastructure supply for

- Planning and construction followed by operation of the machinery assets and buildings


Stuttgart, 14 May 2007 - M+W Zander FE GmbH, Stuttgart, has been awarded a contract for facility management at a factory of a photovoltaic industry. The plant constructor will take over complete technical and infrastructure supply for the First Solar module factory in Frankfurt (Oder). The contract runs until the end of the year 2011. The First Solar module factory was planned and constructed by M+W Zander as general contractor. Final production launch is planned for mid-2007.

"Comprehensive support from planning and construction through to operation of technical and infrastructure systems and buildings means that First Solar only has one single expert contact for operating the entire site," comments Robert Gattereder, Managing Director of M+W Zander FE.
Gattereder continues: "The customer is able to focus entirely on module production – we take care of the entire supply and interface management, and look after warranty tracking."

On the technical side, M+W Zander is responsible for providing the First Solar factory with uninterrupted supply of ultrapure water and gases, cooling water, compressed air. It also ensures that building systems are operating smoothly. Power supply and wastewater treatment also form part of facility management. Infrastructure services for the site covering an area of some 40,000 square meters include security, disposal and cleaning.

First Solar (www.firstsolar.com) produces solar modules using an advanced thin-film semiconductor process that significantly lowers the costs of solar power. First Solar offers a cost-effective alternative to fossil energies in the generation of renewable solar energy for peak loads at commercial prices. Solar energy cuts down greenhouse gas emissions and reduces grid bottlenecks.


M+W Zander FE GmbH is a company in the globally acting M+W Zander Group operating in Europe and the Mediterranean area. The range of services comprises consulting, design and construction of high-tech plants for customers from semiconductor and flat-screen production, the photovoltaic industry and the energy sector. In the photovoltaic and the semiconductor industry, the company numbers among the market leaders for design and turnkey construction of production facilities. In 2006, the M+W Zander Group generated a turnover of approximately 1.76 billion euros with a 7.700-strong workforce worldwide (www.mw-zander.com).


Stuttgart, 14 May 2007

Publication and Reproduction permitted; please send a specimen copy to
M+W Zander FE GmbH.


Attention editorial offices: For further questions please contact Mr.
Michael Gemeinhardt, M+W Zander FE GmbH.

Lotterbergstraße 30
70499 Stuttgart

Tel: +49/711-88041420
Fax: +49/711-8804-1309
E-mail: press@mw-zander.com>press@mw-zander.com
Internet: http://www.mw-zander.com



Sprache:

Online-Pressemappe - alle Pressemitteilungen der M+W Zander FE GmbH | RSS-Feed abonnieren


Pressebilder nur für die redaktionelle Verwendung
Hinweis: Für den Inhalt der Pressemitteilung ist der Emittent / Herausgeber der Meldung »M+W Zander FE GmbH« verantwortlich.

Die Pressemitteilung "M+W Zander takes on complete technical and infrastructure supply for" von M+W Zander FE GmbH ist auch in folgenden Sprachen abrufbar

Daten werden aktualisiert...
Daten werden aktualisiert...