Press Release
Herausgeber: Ge:Net GmbH
Largest individual order in company history - Ge:Net delivers and installs ten meteo towers in Egyptian part of Sahara
Clausthal - Before the end of September, Ge:Net will ship and install ten aluminium lattice towers, each equipped with a wind measurement system, from their own production in the eastern part of the Sahara Desert. This is the most substantial order Ge:Net GmbH has received in its company history so far. The measuring data collected with the company’s technology will serve as foundation for the compilation of a detailed wind atlas covering the region to the west of the Nil.
This part of the Sahara Desert is regarded as one of the most arid areas on the globe whose environmental conditions could not be more demanding. Maximum logistic performance will be called for to transport material, equipment and the entire food and water supply over long distances to the remote building site which is only accessible by highly robust off-road vehicles. The dry, intense desert heat will make assembly and installation work a supreme physical challenge. And the technical components will have to function reliably over the measurement period of one year and guarantee close to 100 % data availability despite exorbitantly high temperatures and extreme thermal fluctuation. Since there is no GSM-net available in this region, the data will be transmitted via high-speed satellite connections.
However! Ge:Net can rely on its proficiency and experience in assembling and erecting their towers and measurement systems under such unfavourable conditions. Over the past ten years, the company has successfully installed towers and measuring systems in Libya, Saudi Arabia (Masdar City) and other Arabic states.
Safe installation and reliable running of wind measurement systems on difficult terrain and under extraordinary conditions has become a trademark of Ge:Net GmbH. And it will guarantee the success of the new wind measuring project in Egypt as well.
About Ge:Net GmbH
Ge:Net provides turnkey wind measurement solutions for the wind farming industry inclusive towers, measuring systems, installation and maintenance. Even remote areas, difficult terrain and extreme weather conditions are no impediments for Ge:Net to install their meteo towers and deliver accurate data about wind potential on site. And with ten years of experience and more than 270 successfully installed meteo towers worldwide to look back on, the company guarantees competence and quality of highest standards.
Download press photos:
https://www.iwrpressedienst.de/ge_net/Bild1.JPG
https://www.iwrpressedienst.de/ge_net/Bild2.JPG
Picture caption (both pitures):
Location in the Sahara Desert
Clausthal, June 22, 2011
Publication and Reprint free of charge; please send a voucher copy to
Ge:Net GmbH.
Attention editorial offices: For further questions please contact Mr.
Johannes Lange, Marketing & Sales, Ge:Net GmbH.
Am Rollberg 1
38678 Clausthal-Zellerfeld, Germany
Tel.: +49 5323 948655
Fax.: +49 5323 948656
E-Mail: lange@genetworld.com
Internet: http://www.genetworld.com
Sprache:


Online-Pressemappe - alle Pressemitteilungen der Ge:Net GmbH | RSS-Feed abonnieren
Pressebilder nur für die redaktionelle Verwendung
Hinweis: Für den Inhalt der Pressemitteilung ist der Emittent / Herausgeber der Meldung »Ge:Net GmbH« verantwortlich.
Die Pressemitteilung "Largest individual order in company history - Ge:Net delivers and installs ten meteo towers in Egyptian part of Sahara" von Ge:Net GmbH ist auch in folgenden Sprachen abrufbar

